logo

Windkraftanlage-Türme malen Stand

Qualität Flugzeuge PU-Wand 10 Mikrometer industrieller Spray-Stand mit Arbeitsaufzug usine

Flugzeuge PU-Wand 10 Mikrometer industrieller Spray-Stand mit Arbeitsaufzug

Cusotmied Paint Booth with working lift Industrial Display Booth for aircraft painting industrial Spray Booth Components There are four main components that can be found in an industrial spray booth: the working chamber and exhaust, intake, air make-up, and accessories. First, the working chamber is where the spray operation is performed. Second, the exhaust filtration takes the air from the working chamber and filters it out through the exhaust chamber. Some spray booths
Qualität Militärspray-Ausrüstungen falten starke Tür-industriellen Spray-Stand für Flugzeuge Malerei usine

Militärspray-Ausrüstungen falten starke Tür-industriellen Spray-Stand für Flugzeuge Malerei

Industry Spray Booth /Paint Booth with Ce Project in Military Industry Factory Inner dimension 15000×5000×5000mm(L×W×H). external dimension 15144×6896×5600mm(L×W×H). basement 2 basements.single one size:13000×840 mm(L×W) front door Side opening door,4 doors,4000×4500 mm(W×H),color:white operation door 2 doors,700×2000mm(W×H),color:white wall 3 Steel reinforcements in the wallboard,3 Steel composite beams in roof.wallboard thickness:70mm,width:1150mm,filled with EPS.two color
Qualität Elektrostatische malende Fertigungsstraße Wind-Blatt TUV durch Luftabsaugungs-System usine

Elektrostatische malende Fertigungsstraße Wind-Blatt TUV durch Luftabsaugungs-System

Quality Air Exhaust system for Wind Blade Painting Production Line Equipments Turnkey Project Sales market and Service: We are the Biggest authorised Equipment Supplier of 36 Car brands 4S Shop in China, such as Volkswagen, Audi, Mazda, Citroen, Peugeot, Honda, Toyota, BWB, Ford and Nissan ect. We also export to more than 80 coutries all over the world, such as the USA, Japan, Russia, Australia, Canada, Germany, Korea, Thailand, Malaysia, Singapore, Vietnam, Pakistan, UEA ect
Qualität Langes Spray-Stand-Wind-Blatt 2.5m Min Spray Coating Line usine

Langes Spray-Stand-Wind-Blatt 2.5m Min Spray Coating Line

Long Spray booth in Wind Blade Painting Production Line Equipments Turnkey Project Quick Details: 1. It is a turnkey Project in Wind Blade Painting line in Yangzhou 2. Spray booth with Side Exhaust ventilation system 3. PLC Smart Control System 4. Room Connection Design to save workshop space 5. Manlift inside the booth Maint Process 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed-circuit
Qualität Großes Bedienfeld-Cer 30min stellte automatische Spray-Beschichtungs-Linie ein usine

Großes Bedienfeld-Cer 30min stellte automatische Spray-Beschichtungs-Linie ein

Big Control Panel with PLC for Wind Blade Painting Production Line Equipments Turnkey Project Maint Process 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed-circuit conveyor, power and free conveyor, overhead open conveyor, and so on 3 Oven: batch oven, hot air circulating drying oven, tunnel oven, bridge drying oven 4 Spray paint room type :Water spray paint room; Water spray paint room; Dry
Qualität Verbindungs-Stand-elektrophoretische malende RoboterFertigungsstraße usine

Verbindungs-Stand-elektrophoretische malende RoboterFertigungsstraße

Connection Booth for Wind Blade Painting Production Line Equipments Turnkey Project Maint Process 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed-circuit conveyor, power and free conveyor, overhead open conveyor, and so on 3 Oven: batch oven, hot air circulating drying oven, tunnel oven, bridge drying oven 4 Spray paint room type :Water spray paint room; Water spray paint room; Dry spray paint
Qualität Doppelschicht lockert metallische Tunnelofen 30um Malerei-Fertigungsstraße auf usine

Doppelschicht lockert metallische Tunnelofen 30um Malerei-Fertigungsstraße auf

Double Layer Fans Supporting for Wind Blade Painting Production Line Equipments Turnkey Project How to choose coating equipment 1. The size and weight of workpiece,especially the max size and weight 2. Is there any requirements about the suspension of the workpiece? 3. The material of the workpiece 4. The anticipative output for the biggest size of the workpiece(how many pcs in 8 hours) 5. The length,width and height of the factory available for the powder coating line 6. The
Qualität Wasserdichtes Manlift innerhalb der malenden Fertigungsstraße usine

Wasserdichtes Manlift innerhalb der malenden Fertigungsstraße

Manlift Inside Paint room for Wind Blade Painting Production Line Equipments Turnkey Project Quick Details: 1. It is a turnkey Project in Wind Blade Painting line in Yangzhou 2. Spray booth with Side Exhaust ventilation system 3. PLC Smart Control System 4. Room Connection Design to save workshop space 5. Manlift inside the booth Maint Process 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed
Qualität Stahl-Fertigungsstraße der Malerei-10um mit Seitenabgasanlage-Wind-Blatt usine

Stahl-Fertigungsstraße der Malerei-10um mit Seitenabgasanlage-Wind-Blatt

Side Exhaust System Wind Blade Painting Production Line Equipments Turnkey Project Maint Process 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed-circuit conveyor, power and free conveyor, overhead open conveyor, and so on 3 Oven: batch oven, hot air circulating drying oven, tunnel oven, bridge drying oven 4 Spray paint room type :Water spray paint room; Water spray paint room; Dry spray paint